tag:blogger.com,1999:blog-3993498847203183398.post4908584643956561325..comments2024-03-28T09:19:27.451+00:00Comments on RevK<sup>®</sup>'s ramblings: Way to design a heating systemRevKhttp://www.blogger.com/profile/12369263214193333422noreply@blogger.comBlogger2125tag:blogger.com,1999:blog-3993498847203183398.post-6249337682840825042009-12-21T09:53:03.517+00:002009-12-21T09:53:03.517+00:00It is a big waste pipe, which is plumber never lag...It is a big waste pipe, which is plumber never lagged it initially.RevKhttps://www.blogger.com/profile/12369263214193333422noreply@blogger.comtag:blogger.com,1999:blog-3993498847203183398.post-8827227596090022009-12-21T09:05:26.659+00:002009-12-21T09:05:26.659+00:00The condensate drain should be routed in 40mm wast...The condensate drain should be routed in 40mm waste pipe if its outside. <br />Ive seen loads routed in overflow pipe, gets cold and freezes.<br />Its better done inside, looks better too!PhilCehttps://www.blogger.com/profile/11131762877921444702noreply@blogger.com